A template-driven inspection and test-records engine for manufacturers and fabricators. Pick a test — weld visual, bend, wall-tie load, galvanising coating, tensile or proof-load, electrical certificates, F-Gas — and InspectIQ builds the form, the certificate and the batch report from the same template, with your pass limits pre-filled from a Product Library. Every record is operator-stamped and certificate-numbered on a tamper-evident audit trail. Runs standalone or inside AssureIQ and TradeIQ. iPhone app on the App Store; Android built from the same code.
From £2,500 implementation + £150 / month, excluding VAT · three-year term, first year in advance · how pricing works
Works with what you already have: Product Library and batch data from your spreadsheet (CSV/XLSX); certificates and DoP drafts as PDF; QR labels for traceability.
Where your data lives: On your own device by default — nothing is sent to us. Hosted team mode gives your whole inspection team per-user sign-in, role-based access (owner/admin/editor) and one shared, live record — synced to the same UK database (Supabase, London, eu-west-2) the iPhone/Android app reads from, so a certificate raised on the shop floor shows up for the office the same moment. Security & trust →
Straight answer: Test standards define the method; acceptance limits come from the product standard, your specification or the customer. InspectIQ records and certifies against them — it is not a certification body and does not replace your inspector's competence.

Capture photo evidence, run the test and certify on site, even offline — then print or share the QR-verified certificate straight from your phone or tablet.
A real walkthrough of InspectIQ — test, certify, and issue a tamper-evident record, start to finish.
Weld visual inspection (BS EN ISO 17637, acceptance to a BS EN ISO 5817 quality level), bend test (BS EN ISO 7438), wall-tie load (BS EN 845-1), galvanising coating (BS EN ISO 1461), tensile/proof-load (BS EN ISO 6892-1), electrical certificates (BS 7671: EIC, EICR, Minor Works), F-Gas, gas appliance safety checks (Gas Safety Regs 1998) and general inspection — the form, certificate and batch report all render from the same config. A Product Library pre-fills each test with your pass requirements, imported from CSV or straight from Excel.
Every record gets a unique, sequential Certificate No — shared across every template so nothing gets renumbered or lost.
Draft UKCA Declarations of Performance and Certificates of Conformity from your FPC and inspection records — manufacturer, AVCP system and declared-performance table pre-filled for you to check and sign.
A failed inspection can raise a non-conformance in one click — root cause, containment and CAPA owner tracked to close-out, ISO 9001 clause 10.2 style.
Every create, edit, void and print is logged and chained — tamper-evident by design, not just a changelog.
Export a self-contained certificate + full audit trail + amendment history as one file, ready to send to a customer's quality department.
Track every gauge and test instrument's last calibration, interval and due date, with an automatic overdue flag and one-click calendar export — so an auditor never finds an out-of-calibration instrument behind one of your certificates.
Pass-rate trend, fail Pareto and a live SPC run chart by product, template, operator or customer — the ISO 9001 management-review numbers, without exporting to Excel.
Metal fabricators, wall-tie and galvanising suppliers and anyone certifying to a product standard — InspectIQ replaces a folder of Word templates and a spreadsheet register with one auditable system. Unlike a general inspection/checklist app, every template already carries its acceptance standard and pulls pass/fail limits from your own Product Library — nobody's typing tolerances into a blank form. The NCR/CAPA workflow and audit trail above follow the structure ISO 9001 and ISO 14001 expect, so your records are already in a shape an auditor can work with.

The test form, the printable certificate and the batch report all come from the same template — no separate documents to keep in sync.
Attach photo evidence per inspection, then print a QR label that opens a self-checking verify card on any phone — no app required.
Embeds into AssureIQ or TradeIQ over the same customer/site list, so gas, statutory and product inspections sit in one place when you need more than one.
The same InspectIQ, wrapped as a native iOS app — inspect, certify and print a QR-verified certificate on site, even offline.



Test standards such as BS EN ISO 7438 define the method; acceptance limits come from the product standard, your specification or the customer — InspectIQ records the applicable standard against every test, then your inspector certifies against it. That's a deliberate honesty line, not a gap.
Visual testing of fusion welds — WPS and welder qualification recorded, acceptance against an ISO 5817 quality level (B/C/D).
Metal bend test method — former Ø, angle, number of bends, recorded per specimen.
Cavity wall-tie tension/compression load test, for wall-tie and masonry-connector manufacturers.
Hot-dip galvanised coating thickness/mass check for galvanised steel components.
2.1/2.2/3.1/3.2 inspection-document classification recorded on every certificate.
InspectIQ structures your inspection records to match the method defined by these standards; it is not a certification body and does not replace your own competence or quality-management judgement — confirm your specific obligations with your quality manager or notified body. Full standards breakdown →
What makes a test certificate credible: sequential numbering, operator identity, immutability, audit trails, batch reports — and where Word/Excel fails.
Read the guide → InspectIQHow ISO 9001 clause 10.2 corrective action really works: containment vs correction, root cause analysis, verifying effectiveness, and why most NCR registers never close the loop.
Read the guide →An interactive guide to InspectIQ, with real screens on sample data. Pick your kind of business and tap through.
We'll set InspectIQ up with your templates, your standards and your customer list, ready to certify on day one.